ECL were contracted to repair a damaged safety floor within a goods lift.
The goods lift is used daily and required works to be carried out on a Sunday after 4pm. Engineers removed and replaced the safety flooring and the lift was available for use on Monday morning. Find the best safety contactor in Newcastle.

Recurring Blocked Drainage Issue Solved
Called out after Mr J was experiencing repeated blocked drain in Newcastle that he was managing to clear away with his hose. Mr J noticed

